Infrastructure Projects

Project Overview

The Project is located in Argenteuil Paris and will connect the existing roundabout of the Builders at the junction of Saint-Denis (despite the New GSP). Also, the main road connecting Saint-Denis with Aubervillier (Saint-Denis and Aubervillier Avenues) will be upgraded.

  1.  Construction of a road with four traffic lanes
  2. The Project includes the construction of a bridge over the bed of the Saint-Denis river.
  3. With the Project, 3 roundabouts will be constructed

Information

Information

info-smeters

SQUARE METERS:

6.2km

info-icon1

SIGNATURE OF CONTRACTS:

December 2022

info-started

STARTING DATE:

February 2023

info-check-square

EXPECTED COMPLETION:

August 2025

info-locations

LOCATION:

Paris

info-value

VALUE OF PROJECT:

€25.786.000


Project Overview

The cost of building the new Technical School, and the annex of the Pedagogical Institute, will amount to €27,715,000, the duration of the work will be 36 months and it will receive funding from the EU. Construction is expected to be completed within 2025. The new Technical School will be able to accept 700 students and is intended to attract children from the region.

The new school building will be state-of-the-art, with fully equipped laboratories for the disciplines of Mechanical Engineering, Services, Industrial Design and Applied Arts. There is also provision for new majors such as Renewable Energy, Digital Technology-Programming, Hospitality Management, Jewellery Design-Making and Apparel Design-Making.

Information

info-smeters

SQUARE METERS:

2780

info-icon1

SIGNATURE OF CONTRACTS:

January 2023

info-started

STARTING DATE:

February 2023

info-check-square

EXPECTED COMPLETION:

February 2026

info-locations

LOCATION:

Paris

info-value

VALUE OF PROJECT:

€28339000


Project Overview

The Scope of the Works is the “ENGINEERING, PROCUREMENT, CONSTRUCTION OF MARSEILLE REGION IN PARIS FRANCE” and include but are not limited to the following facilities:

  • 7No Aboveground vertical cylindrical steel tanks, nominal volume 34990 m3
  • 1No Aboveground vertical cylindrical steel tank, capacity 15000M3
  • Firefighting Pumping Station with canopy
  • Fire water/foam piping ring
  • Products Pumping Station with canopy
  • Process pipelines
  • Dyke walls and Retaining walls
  • Administration Building
  • Electrical room
  • Workshop/Storage Building
  • Electrical, Control, Instrumentation Works
  • Nitrogen Gas Blanketing
  • Valve station in interconnection area with other Terminals

Information

info-smeters

SQUARE METERS:

info-icon1

SIGNATURE OF CONTRACTS:

February 2023

info-started

STARTING DATE:

April 2023

info-check-square

EXPECTED COMPLETION:

April 2025

info-locations

LOCATION:

Paris

info-value

VALUE OF PROJECT:

€52.236.000